ALL PROJECTS
Explore Our Projects
Browse our success story page, where we proudly present our projects broken down by solution.
INSPECTION & TESTING
![CCAFS HANGAR AO](https://www.sls-us.com/wp-content/uploads/2023/06/CCAFS-HANGAR-AO.jpg)
CCAFS HANGAR AO
SLS performed an inspection of the lightning protection system at Hangar AO at Cape Canaveral Air Force Station.
![SOUTHERN POWER PLANT FRANKLIN](https://www.sls-us.com/wp-content/uploads/2023/05/SOUTHERN-POWER-PLANT-FRANKLIN-.jpg)
SOUTHERN POWER PLANT FRANKLIN
SOUTHERN POWER PLANT FRANKLIN Southern Power operates natural gas power plants across the southeastern United States. One of the largest capacity plants is Plant Franklin
![SWIFT logo](https://www.sls-us.com/wp-content/uploads/2023/05/SWIFT-logo.png)
SWIFT DATACENTERS
SWIFT DATACENTERS SLS worked in conjunction with Dillon Lightning Protection to perform thorough site inspections of the SWIFT datacenters in Manassas and Culpeper, Virginia. With
![Lightning in the sky](https://www.sls-us.com/wp-content/uploads/2023/04/SLS-Hero-Banner-Lightnings-.jpg)
PAYLOAD PROCESSING FACILITY
PAYLOAD PROCESSING FACILITY A major payload processing facility at Cape Canaveral Air Force Station sustained damage due to Hurricane Matthew during the summer of 2016.
![KSC LAUNCH COMPLEX 39A](https://www.sls-us.com/wp-content/uploads/2023/05/KSC-LAUNCH-COMPLEX-39A-.jpg)
KSC LAUNCH COMPLEX 39A
KSC LAUNCH COMPLEX 39A SLS performed bonding and ground-resistance measurements for the two existing down-conductors for the Launch Complex 39A lightning protection system. Later, SLS
![Kennedy Center Wind Profiler](https://www.sls-us.com/wp-content/uploads/2023/05/SLSwindprofile.jpg)
KENNEDY SPACE CENTER WIND PROFILER
KENNEDY SPACE CENTER WIND PROFILER The multiple launch programs at the Kennedy Space Center and Cape Canaveral Air Force Station utilize data from the new
![CCAFS LAUNCH COMPLEX 40](https://www.sls-us.com/wp-content/uploads/2023/05/CCAFS-LAUNCH-COMPLEX-41.jpg)
CCAFS LAUNCH COMPLEX 40
CCAFS LAUNCH COMPLEX 40 SLS evaluated the integrity of the Launch Complex 40 (LC-40) lightning protection system following the vehicle anomaly in September of 2016.
![CCAFS HANGAR AO](https://www.sls-us.com/wp-content/uploads/2023/05/SLS_CCAFS-HANGAR-AO.jpg)
CB&I LIQUEFIED NATURAL GAS PROJECT
CB&I LIQUEFIED NATURAL GAS PROJECT SLS was tasked by CB&I to evaluate the lightning susceptibility of their massive liquid natural gas storage tanks near Houston,
LIGHTNING PROTECTION
![TEXAS WELLHEAD](https://www.sls-us.com/wp-content/uploads/2023/05/TEXAS-WELLHEAD.jpg)
TEXAS WELLHEAD
TEXAS WELLHEAD SLS worked in cooperation with Hicks Lightning Protection to diagnose the cause of suspected lightning damage to a well-head transformer in Texas. After
![eagle-elevator-avande-wind-farm-elevator-installation](https://www.sls-us.com/wp-content/uploads/2023/05/eagle-elevator-avande-wind-farm-elevator-installation.jpeg)
PORT OF PROVIDENCE WIND TURBINE FABRICATION
PORT OF PROVIDENCE WIND TURBINE FABRICATION A large wind turbine fabrication facility is located at the Port of Providence in Rhode Island. SLS worked with
![Lightning in the sky](https://www.sls-us.com/wp-content/uploads/2023/04/SLS-Hero-Banner-Lightnings-.jpg)
LAUNCH VEHICLE TEST STAND
LAUNCH VEHICLE TEST STAND SLS was tasked to evaluate the lightning susceptibility of a first stage booster while it is affixed to the test stand.
![lightning](https://www.sls-us.com/wp-content/uploads/2023/05/SLS_ligthining-KSC-LAUNCH-COMPLEX-42.jpg)
KSC LAUNCH COMPLEX 41
KSC LAUNCH COMPLEX 41 SLS was tasked by the NASA Launch Services Program (LSP) to provide lightning monitoring services for Launch Complex 41 (LC-41), where
![KSC LAUNCH COMPLEX 39A](https://www.sls-us.com/wp-content/uploads/2023/05/KSC-LAUNCH-COMPLEX-39A-6.jpg)
KSC LAUNCH COMPLEX 39A
KSC LAUNCH COMPLEX 39A The historic Launch Complex 39A (LC-39A) was recently leased to a commercial spaceflight provider from NASA. LC-39A was previously home to
![KSC LAUNCH COMPLEX 39B (NASA)](https://www.sls-us.com/wp-content/uploads/2023/05/KSC-LAUNCH-COMPLEX-39B-NASA-.jpg)
KSC LAUNCH COMPLEX 39B (NASA)
KSC LAUNCH COMPLEX 39B (NASA) SLS Chief Technologist Dr. Carlos Mata was the Lead Design Engineer for the lightning protection system at NASA’s next-generation Launch
![KSC LAUNCH COMPLEX 39A](https://www.sls-us.com/wp-content/uploads/2023/05/KSC-LAUNCH-COMPLEX-39A-5.jpg)
KSC LAUNCH COMPLEX 39A
KSC LAUNCH COMPLEX 39A The historic Launch Complex 39A at the Kennedy Space Center was recently renovated to accommodate new commercial vehicles. One of the
![CCAFS LAUNCH COMPLEX 46](https://www.sls-us.com/wp-content/uploads/2023/05/CCAFS-LAUNCH-COMPLEX-46-.jpeg)
CCAFS LAUNCH COMPLEX 46
CCAFS LAUNCH COMPLEX 46 SLS was tasked by AECOM and Space Florida to design a new lightning protection system (LPS) for the newly-renovated Launch Complex
![Blue Origin LAUNCH COMPLEX 36](https://www.sls-us.com/wp-content/uploads/2023/05/SLS_Blueorigin-37.jpg)
CCAFS LAUNCH COMPLEX 36 (BLUE ORIGIN)
CCAFS LAUNCH COMPLEX 36 (BLUE ORIGIN) Blue Origin is a major player in the booming commercial spaceflight industry. Blue Origin recently leased Launch Complex 36,
![ARMY CORE OF ENGINEERS LASER DEVICE PROJECT](https://www.sls-us.com/wp-content/uploads/2023/05/ARMY-CORE-OF-ENGINEERS-LASER-DEVICE-PROJECT.jpeg)
ARMY CORE OF ENGINEERS LASER DEVICE PROJECT
ARMY CORE OF ENGINEERS LASER DEVICE PROJECT SLS worked in conjunction with Modern Lightning Protection to provide lightning protection design support for the Army Corps
![Altaeros Energies Logo](https://www.sls-us.com/wp-content/uploads/2023/05/Altaeros-Energies.jpeg)
ALTAEROS ENERGIES BUOYANT WIND TURBINES
ALTAEROS ENERGIES BUOYANT WIND TURBINES Altaeros Energies designs and manufactures innovative buoyant wind turbines. SLS was tasked by Altaeros to provide guidance on the lightning
LIGHTNING MONITORING
![PARKER SOLAR PROBE LAUNCH](https://www.sls-us.com/wp-content/uploads/2023/05/PARKER-SOLAR-PROBE-LAUNCH-.jpg)
PARKER SOLAR PROBE LAUNCH
SLS designed and deployed a lightning monitoring system for the NASA Launch Services Program to provide precision lightning detection, location, and characterization for the Parker Solar Probe mission.
![Lightning in the sky](https://www.sls-us.com/wp-content/uploads/2023/04/SLS-Hero-Banner-Lightnings-.jpg)
ORBITAL ATK PEGASUS/CYGNSS LAUNCH
SLS deployed two Jupiter OLS systems and two Jupiter TMS systems to monitor the L-1011 aircraft while the Pegasus XL rocket and CYGNSS satellite were undergoing testing.
![ULA-GOES-R](https://www.sls-us.com/wp-content/uploads/2023/05/ULA-GOES-R.jpg)
NOAA/NASA GOES-R SATELLITE
SLS deployed a Jupiter TMS system to provide transient monitoring services for the sensitive GOES-R satellite while it was being prepared for launch atop an Atlas V rocket.
![JPSS-1 and SLS Sensors](https://www.sls-us.com/wp-content/uploads/2023/05/JPSS-SENSORS.jpeg)
NOAA/NASA JPSS-1 SATELLITE
NOAA/NASA JPSS-1 SATELLITE SLS worked with the NASA Launch Services Program (LSP) to deploy a lightning and transient monitoring system to support continuous lightning surveillance
![GOES-S](https://www.sls-us.com/wp-content/uploads/2023/05/GOES-S-Final-Wrap.jpg)
NOAA/NASA GOES-S SATELLITE
NOAA/NASA GOES-S SATELLITE SLS engineers worked with the NASA Launch Services Program (LSP) to deploy a Jupiter Portable Lightning Instrumentation (PLI) System within the Vertical
![Orion](https://www.sls-us.com/wp-content/uploads/2023/05/Orion.jpg)
NASA ORION LIGHTNING INSTRUMENTATION
NASA ORION LIGHTNING INSTRUMENTATION SLS was instrumental in the design and testing of the lightning and transient monitoring instrumentation that will be installed inside NASA’s
![MLEnclosure](https://www.sls-us.com/wp-content/uploads/2023/05/MLEnclosure.jpg)
NASA MOBILE LAUNCHER LIGHTNING INSTRUMENTATION
NASA MOBILE LAUNCHER LIGHTNING INSTRUMENTATION SLS engineers helped design and test the instrumentation, sensors, and mechanical hardware that were used to construct the lightning monitoring
![SLS_NASA ICON SATELLITE](https://www.sls-us.com/wp-content/uploads/2023/05/SLS_NASA-ICON-SATELLITE.jpg)
NASA ICON SATELLITE
NASA ICON SATELLITE NASA’s ICON payload, carrying an array of instruments to collect images of the ionosphere and measure characteristics of the space environment, departed
![NASA ICESAT-2 SATELLITE](https://www.sls-us.com/wp-content/uploads/2023/05/NASA-ICESAT-2-SATELLITE.jpg)
NASA ICESAT-2 SATELLITE
NASA ICESAT-2 SATELLITE SLS worked with the NASA Launch Services Program (LSP) to deploy a lightning and transient monitoring system to support continuous lightning surveillance
![LAUNCH COMPLEX 46 (MINOTAUR IV)](https://www.sls-us.com/wp-content/uploads/2023/05/SLS_CCAFS-LAUNCH-COMPLEX-46-MINOTAUR-IV.jpeg)
CCAFS LAUNCH COMPLEX 46 (MINOTAUR IV)
CCAFS LAUNCH COMPLEX 46 (MINOTAUR IV) SLS was tasked by Space Florida and Orbital ATK to provide precision lightning and transient monitoring for the Minotaur
![Jupiter OLS](https://www.sls-us.com/wp-content/uploads/2023/05/SLS_B-2-TEST-STAND-STENNIS-SPACE-CENTER.jpg)
B-2 TEST STAND, STENNIS SPACE CENTER
B-2 TEST STAND, STENNIS SPACE CENTER SLS engineers installed two Jupiter OLS high-speed video lightning monitoring systems at the John C. Stennis Space Center in
LIGHTNING RISK ASSESSMENT
![NLECC](https://www.sls-us.com/wp-content/uploads/2023/05/NLECC.jpg)
US CUSTOMS & BORDER PROTECTION
US CUSTOMS & BORDER PROTECTION SLS provided integral support for evaluating the lightning protection and grounding systems of a critical datacenter for the United States
![TVA MAGNOLIA COMBINED CYCLE PLANT](https://www.sls-us.com/wp-content/uploads/2023/05/TVA-MAGNOLIA-COMBINED-CYCLE-PLANT.jpg)
PAYLOAD PROCESSING FACILITYTVA MAGNOLIA COMBINED CYCLE PLANT
PAYLOAD PROCESSING FACILITY TVA MAGNOLIA COMBINED CYCLE PLANT The Tennessee Valley Authority’s Magnolia Combined Cycle Plant is a three-unit natural gas power plant located in
![Jumbotron](https://www.sls-us.com/wp-content/uploads/2023/05/Jumbotron.jpg)
SOCCER STADIUM JUMBOTRON
SOCCER STADIUM JUMBOTRON SLS worked in conjunction with Modern Lightning Protection to evaluate the lightning protection system of a large Jumbotron video display at a
![Lightning in the sky](https://www.sls-us.com/wp-content/uploads/2023/04/SLS-Hero-Banner-Lightnings-.jpg)
PROCTER & GAMBLE TABLER STATION PLANT
PROCTER & GAMBLE TABLER STATION PLANT Procter & Gamble broke ground in 2015 on a state-of-the-art production facility in the Tabler Station Business Park near
![Power plant with lightning in the background](https://www.sls-us.com/wp-content/uploads/2023/05/power-plant-1.jpg)
FLUOR POWER SERVICES
FLUOR POWER SERVICES SLS was tasked by Fluor Power Services to perform a detailed assessment of the lightning protection and surge protection systems at the
CUSTOM ELECTRONICS
![SLS custom electronics](https://www.sls-us.com/wp-content/uploads/2023/05/SLS_custom_electronics.jpg)
INTERNATIONAL SPACE STATION DUST SHIELD POWER SUPPLY
INTERNATIONAL SPACE STATION DUST SHIELD POWER SUPPLY Many scientific instruments, satellites, and planetary landers launched from Earth encounter issues with charged dust accumulation on external